Novi Medical Center presented MRI shielding that defeats public-safety RF. WZC engineered a six-sector ERCES that meets both The Joint Commission and IFC 510, delivered in three weeks with first-pass AHJ approval.
- Client:
- Novi Medical Center
- Location:
- Novi, Michigan
- Industry:
- Healthcare
- Service:
- Public Safety DAS / ERCES
Six sectors around a shielded core
- Coverage sectors
- 6
- Coverage sectors
- Project timeline
- 3 wk
- Project timeline
- Pass AHJ approval
- 1st
- Pass AHJ approval
The Novi Medical Center design, six ERCES sectors engineered so first-responder coverage holds despite the RF-shielded imaging suite.
The challenge
MRI suites are built to keep RF out, and the same shielding that protects imaging equipment also defeats public-safety radio signal, which made ordinary ERCES design impossible.
The solution
A six-sector ERCES design, sectorized so first-responder coverage holds throughout the facility despite the shielded imaging environment, satisfying The Joint Commission and IFC 510 at once.
Coverage engineered around MRI shielding
MRI suites are built to keep RF out, the same shielding that protects imaging equipment also defeats public-safety radio signal. At Novi Medical Center, that made ordinary ERCES design impossible and demanded an engineering answer.
WZC's answer was a six-sector ERCES design, sectorized so first-responder coverage holds throughout the facility despite the shielded imaging environment.
The design had to satisfy two rulebooks at once, Joint Commission accreditation requirements and IFC 510 fire code. WZC met both, completed the project in three weeks, and earned full first-pass AHJ approval.
- Six-sector ERCES design engineered around MRI shielding
- Meets The Joint Commission and IFC 510 requirements
- Completed in three weeks with full first-pass AHJ approval
More results
Senior Living
100%grid pass rate at acceptanceERCES coverage from 51% to 100% in four days
A 15-story senior-living high-rise failing public-safety coverage at 51%, brought to full compliance in four days.Read case studyRetail
50+sites deliveredERCES compliance across 50+ store deployments
Turnkey ERCES for new and existing supercenters, grid testing, design, install, AHJ approval, commissioning.Read case studyHotel / Hospitality
1stpass AHJ approvalFailing benchmark to first-pass AHJ approval
A 7-floor hotel that failed its public-safety benchmark test, brought to full code coverage and approved on the first inspection.Read case study
Let's solve your wireless challenge
Tell us about your building and goals. A WZC engineer will get back to you within one business day.