Case study · Senior Living
ERCES coverage from 51% to 100% in four days
Clawson Manor, a 15-story senior-living co-op in Clawson, Michigan, was failing emergency-responder coverage at 51% on its benchmark grid test. WZC brought the building to 100% passing coverage in four days.
- Client:
- Clawson Manor
- Location:
- Clawson, Michigan
- Industry:
- Senior Living
- Service:
- Public Safety DAS / ERCES
51% failing to 100% passing, measured on the grid
- Coverage at benchmark
- 51%
- Coverage at benchmark
- grid pass rate at acceptance
- 100%
- grid pass rate at acceptance
- Days to install
- 4
- Days to install
- Floors covered
- 15
- Floors covered
Grid-test results at Clawson Manor: a 51% failing benchmark brought to a 100% grid pass rate at acceptance by a four-day passive DAS install.
The challenge
Benchmark grid testing showed the 15-story high-rise failing emergency-responder coverage at just 51%, in the kind of building where first responders cannot afford a dead zone.
The solution
WZC performed the grid testing, then designed a passive DAS in iBwave and coordinated the plan directly with the AHJ. With the design approved, the crew installed the system in four days.
Four days from failing grid test to full compliance
- 01
Benchmark: 51% coverage
- 02
Acceptance: 100% passing
Clawson Manor is a 15-story senior-living co-op in Clawson, Michigan, the kind of building where first responders cannot afford a dead zone. Benchmark grid testing showed the high-rise failing emergency-responder coverage at just 51%.
The result: 100% passing coverage across all 15 floors, four days from first install to acceptance test.
- On-site grid testing to benchmark real-world coverage
- Passive DAS designed in iBwave
- AHJ coordination handled end to end by WZC
- Installed and passing at 100% in four days
More results
Retail
50+sites deliveredERCES compliance across 50+ store deployments
Turnkey ERCES for new and existing supercenters, grid testing, design, install, AHJ approval, commissioning.Read case studyHotel / Hospitality
1stpass AHJ approvalFailing benchmark to first-pass AHJ approval
A 7-floor hotel that failed its public-safety benchmark test, brought to full code coverage and approved on the first inspection.Read case studyHealthcare
6coverage sectorsERCES through MRI shielding & Joint Commission compliance
A healthcare facility with MRI shielding challenges brought into Joint Commission and IFC compliance across six sectors.Read case study