Before you fail inspection
Is your building at risk?
Six questions, two minutes, and you will know whether your certificate of occupancy is waiting on a radio test nobody has run yet. Then take the checklist the inspector will be working from.
Two-minute check
Answer six questions honestly
Not sure counts as half a yes. If you do not know, that is itself a reason to get the building surveyed.
Two-minute ERCES risk check
A WZC engineer reads every submission and replies within one business day.
6 questions left.
Want the checklist in your inbox
The checklist
Ten things to settle before the inspector arrives
This is the order they come up in a real project. Each one you can tick is a week you do not lose later.
Confirm the code trigger with the AHJ
Which edition of IFC 510 or NFPA 1225 applies, and whether your occupancy type and size are in scope. Get it in writing.
Run a baseline grid test
Measured, floor by floor, including stairwells, the garage and plant rooms. This is the document every later conversation is argued from.
Get the AHJ's requirements before design
Frequencies, equipment class, monitoring, battery backup hours and the documentation format vary by jurisdiction. Ask before ordering anything.
Model the building in iBwave against the measured baseline
A design that starts from assumed materials fails on the day the assumptions are wrong.
Design with margin, not to the minimum
Buildings change. A system at exactly 95 percent general and 99 percent critical fails the annual re-test after the first fit-out.
Specify the donor antenna path
Where it goes on the roof, what it points at, and how the coax gets to the head end. Late changes here move ceilings.
Build fire-rated pathways and the monitoring loop
Survivable cable, rated enclosures, and dry contacts back to the fire alarm panel. Inspectors check these first because they can.
Size battery backup to the standard
Twelve or twenty-four hours depending on the code edition. It is the most commonly under-specified item on the list.
Schedule the acceptance test with the AHJ present
Same grid, same method as the baseline. Book it before the certificate of occupancy depends on it.
Set the annual re-test and monitoring contract
Compliance is a schedule, not an event. Put the first anniversary in the calendar on the day you pass.
Code minimum is 95 percent of general areas and 99 percent of critical areas at or above the signal threshold, per IFC 510 and NFPA 1225. Your AHJ may require more.