Before you fail inspection

Is your building at risk?

Six questions, two minutes, and you will know whether your certificate of occupancy is waiting on a radio test nobody has run yet. Then take the checklist the inspector will be working from.

Two-minute check

Answer six questions honestly

Not sure counts as half a yes. If you do not know, that is itself a reason to get the building surveyed.

Two-minute ERCES risk check

A WZC engineer reads every submission and replies within one business day.

248-946-4000info@wzcnetworking.net

24371 Catherine Industrial Dr, Suite 225, Novi, MI 48375

  1. 01Is the building new construction, or has it had a major renovation or change of occupancy since 2015?

    That is what triggers the ERCES requirement under IFC 510 in most jurisdictions.

  2. 02Does it have levels below grade: a parking garage, a basement plant room, a lower service corridor?

    Below grade is where public-safety signal dies first, and where firefighters go with the standpipe.

  3. 03Is the facade Low-E glass, metal cladding, or precast concrete?

    Low-E glass alone takes 30 dB out of a 700/800 MHz signal. Metal cladding takes 40.

  4. 04Is it more than three stories, or more than 50,000 square feet?

    The bigger the building, the further the signal has to travel from the nearest macro site, and the more of it is interior.

  5. 05Has a public-safety radio grid test ever been done inside the building?

    A documented grid test is the only baseline an inspector will accept. Without one there is nothing to argue from.

  6. 06Does a certificate of occupancy, permit, or tenant fit-out depend on an AHJ inspection in the next twelve months?

    That is the deadline. A failed test at that point is measured in weeks of delay, not dollars.

6 questions left.

Want the checklist in your inbox

Response within one business day.

The checklist

Ten things to settle before the inspector arrives

This is the order they come up in a real project. Each one you can tick is a week you do not lose later.

  • Confirm the code trigger with the AHJ

    Which edition of IFC 510 or NFPA 1225 applies, and whether your occupancy type and size are in scope. Get it in writing.

  • Run a baseline grid test

    Measured, floor by floor, including stairwells, the garage and plant rooms. This is the document every later conversation is argued from.

  • Get the AHJ's requirements before design

    Frequencies, equipment class, monitoring, battery backup hours and the documentation format vary by jurisdiction. Ask before ordering anything.

  • Model the building in iBwave against the measured baseline

    A design that starts from assumed materials fails on the day the assumptions are wrong.

  • Design with margin, not to the minimum

    Buildings change. A system at exactly 95 percent general and 99 percent critical fails the annual re-test after the first fit-out.

  • Specify the donor antenna path

    Where it goes on the roof, what it points at, and how the coax gets to the head end. Late changes here move ceilings.

  • Build fire-rated pathways and the monitoring loop

    Survivable cable, rated enclosures, and dry contacts back to the fire alarm panel. Inspectors check these first because they can.

  • Size battery backup to the standard

    Twelve or twenty-four hours depending on the code edition. It is the most commonly under-specified item on the list.

  • Schedule the acceptance test with the AHJ present

    Same grid, same method as the baseline. Book it before the certificate of occupancy depends on it.

  • Set the annual re-test and monitoring contract

    Compliance is a schedule, not an event. Put the first anniversary in the calendar on the day you pass.

Code minimum is 95 percent of general areas and 99 percent of critical areas at or above the signal threshold, per IFC 510 and NFPA 1225. Your AHJ may require more.

Reliable communication built in, confidence built on: a glass tower at night with emergency radio coverage on every floor

Let's solve your wireless challenge

Tell us about your building and goals. A WZC engineer will get back to you within one business day.