The difference
From dead zones to code-compliant coverage
A failing benchmark test is the legal trigger for an ERCES. Toggle the building to see how a roof donor antenna, a bi-directional amplifier, and a coax riser carry public-safety signal to every floor, the outcome we engineer and then prove with an on-site grid test.
- General coverage at benchmark (FAIL)
- 33%
- General coverage at benchmark (FAIL)
- General coverage at acceptance (PASS)
- 98%
- General coverage at acceptance (PASS)
- Critical-area coverage at acceptance (PASS)
- 99%
- Critical-area coverage at acceptance (PASS)
- Sq ft brought into ERCES compliance
- 15M+
- Sq ft brought into ERCES compliance
The grid test
From dead zones to code-compliant coverage
Every ERCES project starts and ends with the same test: the building is divided into measurement grids, each one passes or fails, and compliance is the share that passed.
The difference
Before and after, floor by floor
Before the ERCES system is installed, the building fails at 33% general coverage. After installation, the acceptance grid test shows 98% general and 99% critical coverage, a pass.
- General coverage at benchmark (FAIL)
- 33%
- General coverage at benchmark (FAIL)
- General coverage at acceptance (PASS)
- 98%
- General coverage at acceptance (PASS)
- Critical-area coverage at acceptance (PASS)
- 99%
- Critical-area coverage at acceptance (PASS)
- Sq ft brought into ERCES compliance
- 15M+
- Sq ft brought into ERCES compliance
| Floor | Before (dBm) | Before coverage | After (dBm) | After coverage |
|---|---|---|---|---|
| F7 | −122 | 4% | −78 | 95% |
| F6 | −118 | 8% | −74 | 96% |
| F5 | −110 | 16% | −70 | 97% |
| F4 | −104 | 27% | −67 | 99% |
| F3 | −96 | 41% | −63 | 98% |
| F2 | −88 | 58% | −60 | 99% |
| G | −72 | 78% | −58 | 99% |
| Whole building | 33% (FAIL) | 98% general, 99% critical (PASS) |
F7
- Before (dBm):
- −122
- Before coverage:
- 4%
- After (dBm):
- −78
- After coverage:
- 95%
F6
- Before (dBm):
- −118
- Before coverage:
- 8%
- After (dBm):
- −74
- After coverage:
- 96%
F5
- Before (dBm):
- −110
- Before coverage:
- 16%
- After (dBm):
- −70
- After coverage:
- 97%
F4
- Before (dBm):
- −104
- Before coverage:
- 27%
- After (dBm):
- −67
- After coverage:
- 99%
F3
- Before (dBm):
- −96
- Before coverage:
- 41%
- After (dBm):
- −63
- After coverage:
- 98%
F2
- Before (dBm):
- −88
- Before coverage:
- 58%
- After (dBm):
- −60
- After coverage:
- 99%
G
- Before (dBm):
- −72
- Before coverage:
- 78%
- After (dBm):
- −58
- After coverage:
- 99%
Whole building
- Before (dBm):
- Before coverage:
- 33% (FAIL)
- After (dBm):
- After coverage:
- 98% general, 99% critical (PASS)
Code minimum: at least 95% general and 99% critical coverage at or above −95 dBm, per IFC 510 and NFPA 1225. Illustrative, modeled on a real 7-floor project. This building: 81,706 sq ft.
Related services
- Public Safety DAS & ERCESGrid testing, iBwave design, AHJ coordination, installation and annual recertification for public-safety DAS.
- Passive DAS architectureHow a passive public-safety DAS works: a donor antenna, one bi-directional amplifier, passive splitters and ceiling antennas, all over coax.
- Hybrid DAS architectureHow a hybrid public-safety DAS works: a master BDA converts RF to optical and drives fiber remote units, each feeding local antennas over coax.
- ERCES Grid Test QuoteGet a benchmark grid test quoted: the measured start of every ERCES project.
Let's solve your wireless challenge
Tell us about your building and goals. A WZC engineer will get back to you within one business day.